To make the error return consistent across e2e tests we have decided
to remove with error presence from the logs and this commit
does that for e2e/upgrade-rbd.go.
Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
We have many declarations and invocations..etc with long lines which are
very difficult to follow while doing code reading. This address the issues
in 'e2e/upgrade_*.go' files to restrict the line length to 120 chars.
Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
This commit calls `waitForDaemonSets` and `waitForDeploymentComplete`
after upgrading to wait for csi driver pods to be in running state
for both rbd and cephfs upgrade tests.
Signed-off-by: Rakshith R <rar@redhat.com>
Currently, in rbd snapshot restore and volume clone E2E we
are not checking any data consistency after doing snapshot
restore or volume clone. Hence, this PR writes the data in
the PVC and checks the checksum of the file and verify it with
the snapshot or cloned PVC.
Signed-off-by: Yati Padia <ypadia@redhat.com>
When tests run and something goes wrong during deployment, not all
information is available. Logging the events from the namespace where
Ceph-CSI (and Vault) is deployed, might help with troubleshooting.
Signed-off-by: Niels de Vos <ndevos@redhat.com>
If loadPVC() fails, it return error and we expect the PVC object
to be nil too. In many places we check on the error and exit.
However in few places we are looking at PVC object.
This commit make the condition check on `err` instead of `PVC`
object for consistency.
Signed-off-by: Humble Chirammal <hchiramm@redhat.com>