Commit Graph

13 Commits

Author SHA1 Message Date
Madhu Rajanna
2a7f6bbcb9 rbd: take lock on targetpath during node operation
We should not be dependent on the CO to ensure
that it will serialize the request instead of
that we need to have own internal locks to ensure
that we dont do concurrent operations for same
request.

Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
(cherry picked from commit b6bd8ca71a)
2024-11-21 12:24:34 +00:00
Madhu Rajanna
3967e4dae9 cleanup: fix static checks
fix SA1019 static check to replace
io/utils with os package and sets
with generic sets

Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
2023-02-03 08:55:43 +00:00
Niels de Vos
6d00b39886 cleanup: move log functions to new internal/util/log package
Moving the log functions into its own internal/util/log package makes it
possible to split out the humongous internal/util packages in further
smaller pieces. This reduces the inter-dependencies between utility
functions and components, preventing circular dependencies which are not
allowed in Go.

Updates: #852
Signed-off-by: Niels de Vos <ndevos@redhat.com>
2021-08-26 09:34:05 +00:00
Humble Chirammal
c42d4768ca util: remove the deleteLock acquistion check for clone and snapshot
At present while acquiring the deleteLock on the volume, we check
for ongoing clone and snapshot creation operations on the same.
Considering snapshot and clone controllers does not allow parent
volume deletion on subjected operations, we can be free from this
extra check.

Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
2021-07-22 15:07:49 +00:00
Rakshith R
43f753760b cleanup: resolve nlreturn linter issues
nlreturn linter requires a new line before return
and branch statements except when the return is alone
inside a statement group (such as an if statement) to
increase code clarity. This commit addresses such issues.

Updates: #1586

Signed-off-by: Rakshith R <rar@redhat.com>
2021-07-22 06:05:01 +00:00
Humble Chirammal
bd947bbe31 util: remove deleteLock check while acquiring snapshot createLock
snapshot controller make sure the pvc which is the source for the
snapshot request wont get deleted while snapshot is getting created,
so we dont need to check for any ongoing delete operation here on the
volume.

Subjected code path in snapshot controller:

```
pvc, err := ctrl.getClaimFromVolumeSnapshot(snapshot)
.
..
pvcClone.ObjectMeta.Finalizers = append(pvcClone.ObjectMeta.Finalizers, utils.PVCFinalizer)
_, err = ctrl.client.CoreV1().PersistentVolumeClaims(pvcClone.Namespace).Update(..)
```

Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
2021-07-17 10:23:13 +00:00
Humble Chirammal
94c5c5e119 util: remove deleteLock while we acquire clone operation lock
clone controller make sure there is no delete operation happens
on the source PVC which has been referred as the datasource of
clone PVC, we are safe to operate without looking at delete
operation lock in this case.

Subjected code in the controller:

...
if claim.Spec.DataSource != nil && rc.clone {
		err = p.setCloneFinalizer(ctx, claim)
		...
}

if !checkFinalizer(claim, pvcCloneFinalizer) {
		claim.Finalizers = append(claim.Finalizers, pvcCloneFinalizer)
		_, err := p.client.CoreV1().PersistentVolumeClaims(claim.Namespace).Update(..claim..)
	}

Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
2021-07-16 12:32:28 +00:00
Yati Padia
4a649fe17f cleanup: resolve godot linter
This commit resolves godot linter issue
which says "Comment should end in a period (godot)".

Updates: #1586

Signed-off-by: Yati Padia <ypadia@redhat.com>
2021-07-13 06:50:03 +00:00
Madhu Rajanna
9229e84a77 util: rename ErrorLog to ErrorLogMsg to parity
as we have 2 functions for logging. one for logging
with message and another one is for logging with
context. renamed ErrorLog to  ErrorLogMsg to log
with messages.

Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
2020-08-13 09:44:12 +00:00
Niels de Vos
bf02227207 util: use local ErrorLog() for OperationLock.release() instead of klog
Signed-off-by: Niels de Vos <ndevos@redhat.com>
2020-08-11 08:11:37 +00:00
Madhu Rajanna
d6348545ab journal: Add additional operation based locking
As we are adding new functionalities like Create/Delete
snapshot,Clone from Snapshot and Clone from Volume.
with the current implementation, there are only serial
operations allowed for this functionalities, for some
function we can allow parallel operations like
Clone from snapshot and Clone from Volume and Create
`N` snapshots on a single volume.

Delete Volume: Need to ensure that there is no clone,
Snapshot create and  Expand volume in progress.

Expand Volume: Need to ensure that there is no clone,
snapshot create and cloning in progress

Delete Snapshot: Need to ensure that there is no
cloning in progress

Restore Volume/Snapshot: Need to ensure that there is
no Expand or delete operation in progress.

Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
2020-07-21 13:25:19 +00:00
Yug Gupta
753f6b7fec cleanup: fix golint warnings in util, e2e
util: golint warns about exported methods to have a
comment or to unexport them.

e2e: golint warns about package comment to be of the form
"Package e2e ..."

Reported-by: https://goreportcard.com/report/github.com/ceph/ceph-csi

Updates: #975

Signed-off-by: Yug Gupta <ygupta@redhat.com>
2020-05-20 13:18:41 +00:00
Niels de Vos
32839948ef cleanup: move pkg/ to internal/
The internal/ directory in Go has a special meaning, and indicates that
those packages are not meant for external consumption. Ceph-CSI does
provide public APIs for other projects to consume. There is no plan to
keep the API of the internally used packages stable.

Closes: #903
Signed-off-by: Niels de Vos <ndevos@redhat.com>
2020-04-23 11:00:59 +00:00