When deleting a PVC fails, the following messages are repeated until a
timeout is hit:
cephfs-80811 in state &PersistentVolumeClaimStatus{Phase:,AccessModes:[],Capacity:ResourceList{},Conditions:[]PersistentVolumeClaimCondition{},} to be deleted (600 seconds elapsed)
Because the Phase is not set, the PVC seems to be in a strange state. In
case this happens, log all details from the PVC so that we can identify
additional conditions to check for completed deletion.
Updates: #1874
Signed-off-by: Niels de Vos <ndevos@redhat.com>
When passing a pointer to a PVC and PV, the status of the deleted
objects is not logged correctly. The `PersistentVolumeClaim.Status` and
`PersistedVolume.Status` that is added to the logs contain the status of
the initially created object (reference to the PVC/PV). When the PVC/PV
is removed, there is no guarantee that the object is updated.
Logs show an empty (nullified) `PersistentVolumeClaim.Status`, which is
not helpful. Instead, use the returned PVC/PV from the `Get()` function
and use that for further logging. Even when the `.Status` struct from
the PVC/PV gets wiped, the returned object should have correct details.
Updates: #1874
Signed-off-by: Niels de Vos <ndevos@redhat.com>
Failures when deploying Hashicorp Vault are logged as informative. This
means that testing will continue, even if Vault will not be available.
Instead of logging the errors as INFO, use FAIL so that tests are not
run and the problems are identified early and obviously.
Updates: #1795
Signed-off-by: Niels de Vos <ndevos@redhat.com>
The e2e tests create a Secret for using with the RBD StorageClass.
However this Secret was not used, instead the Rook generated Secret was
linked in the StorageClass.
By using our own Secret from the examples, Rook should not touch it when
we make modifications. In addition, no modifications are needed for
encryption anymore, as these are included in the example.
Updates: #1795
Signed-off-by: Niels de Vos <ndevos@redhat.com>
Added more example to run e2e and functional tests using `go test` and
`make` commands.
Signed-off-by: Prasanna Kumar Kalever <prasanna.kalever@redhat.com>
IsRetryableAPIError is not available in latest
kubernetes release ie 1.20.0 created a internal
function called isRetryableAPIError for the same.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
When tests run and something goes wrong during deployment, not all
information is available. Logging the events from the namespace where
Ceph-CSI (and Vault) is deployed, might help with troubleshooting.
Signed-off-by: Niels de Vos <ndevos@redhat.com>
The csi.volume.owner should get stored when the csi-provisioner sidecar
passes additional metadata. This option is now enabled by default, so
the owner (Kubernetes Namespace) of RBD images is expected to be
available.
Signed-off-by: Niels de Vos <ndevos@redhat.com>
Once the Vault API removed a secret, the contents will have been wiped.
The key is still available, until it gets destroyed. This causes the e2e
test to detect an empty secret, and assume that it has not been deleted
yet.
By requesting the `data` field from the secret, an error is thrown in
case the secret has been wiped. This makes it possible for the e2e test
to detect that the secret has been removed and scheduled for destroying.
Signed-off-by: Niels de Vos <ndevos@redhat.com>
This commits adds an E2E testing
to verify the metadata created by controller,
We are not checking the generated omap data,
but we will be verify PVC resize and binding
pvc to application.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
Reduce the number of images that get pulled from Docker Hub. Use the
official CentOS container registry instead.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
If the imagePullPolicy is not set and the image
tag is empty or latest the image is always pulled.
This commit sets the policy to pull image if not
present.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
There are several go-routines where Failf() is called, which will cause
a Golang panic inside the Ginko test framework. Instead of aborting the
go-routine, capture the error and check for failures once all
go-routines have finished.
The CephFS tests have been updated already, this changs only affects the
validatePVCClone() utility function.
Updates: #1359
Signed-off-by: Niels de Vos <ndevos@redhat.com>
There are several go-routines where Failf() is called, which will cause
a Golang panic inside the Ginko test framework. Instead of aborting the
go-routine, capture the error and check for failures once all
go-routines have finished.
The CephFS tests have been updated already, this changs only affects the
RBD tests.
Updates: #1359
Signed-off-by: Niels de Vos <ndevos@redhat.com>
There are several go-routines where Failf() is called, which will cause
a Golang panic inside the Ginko test framework. Instead of aborting the
go-routine, capture the error and check for failures once all
go-routines have finished.
Updates: #1359
Signed-off-by: Niels de Vos <ndevos@redhat.com>
The upgrade-tests-cephfs fails relative regularly with the following
error during intial deployment:
timeout waiting for deployment csi-cephfsplugin-provisioner with error error waiting for deployment "csi-cephfsplugin-provisioner" status to match expectation: etcdserver: request timed out
By detecting if the API-server returned a non-fatal error, the test does
not need to abort, but can wait for completion. PollImmediate() will
still return ErrWaitTimeout once the timeout elapsed.
Signed-off-by: Niels de Vos <ndevos@redhat.com>
If loadPVC() fails, it return error and we expect the PVC object
to be nil too. In many places we check on the error and exit.
However in few places we are looking at PVC object.
This commit make the condition check on `err` instead of `PVC`
object for consistency.
Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
The added anti-affinity rules prevent provisioner operators from scheduling on
the same nodes. The kubernetes scheduler will spread the pods across nodes to
improve availability during node failures.
Signed-off-by: Nico Berlee <nico.berlee@on2it.net>
validate backend rbd images count in each
E2E test cases. This helps a lot to catch
the issues in each test case.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
These test cases are will be executed against a rados namespace.
- Create a PVC and bind it to an app.
- Resize block PVC and check device size.
- Create a PVC clone and bind it to an app.
Signed-off-by: Mehdy Khoshnoody <mehdy.khoshnoody@gmail.com>
As we are populating the volume in other two test cases for clone and
snapshot operation, we dont need a specific test case now.
WriteDataInPod() function is also changed to take the pod spec and write
some data to it
Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
writeDataInPod() write data to the attached PVC using `dd` command
It leave the pod and pvc state as it is.
Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
In rbd E2E testing,we need to create snap and clone
as parallel operation.
This helps us to insure that functionality works when
we have parallel delete and create operations and also
it helps to catch bugs when we get parallel requests.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
In Go 1.13, the fmt.Errorf function supports a new %w verb.
When this verb is present, the error returned by fmt.Errorf
will have an Unwrap method returning the argument of %w,
which must be an error. In all other ways, %w is identical to %v.
Updates: #1227
Signed-off-by: Yug <yuggupta27@gmail.com>
We had "ns" as a parameter and then trying to
declare it also as a local variable, which is what
the complaint about "shadowing" refers to.
Issue reported:
shadow: declaration of "ns" shadows declaration at line 57 (govet)
Signed-off-by: Yug <yuggupta27@gmail.com>
Added two new parameters for e2e test to skip
rbd and cephfs tests. This will help us to
run more test in Travis CI.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
Reduced the number of pods created
in ROX E2E to save some time in E2E
and changed the waiting time from 2 to 1
min.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
with new implemntation when user creates a snapshot
in backend we are creating rbd image, we need to
validate the total images count in backend when
creating snapshots and clones.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
Added E2E testing for creation
and mounting of ROX PVC, if the
PVC accessmode is ReadOnlyMany
the application pod should not get
write access to it.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
If the mount option is readonly in app
pod, the pod should not get the write
access to the mounted cephfs subvolume.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
With the current code base, the subvolumegroup will
be created once, and even for a different cluster,
subvolumegroup creation is not allowed again.
Added support multiple subvolumegroups creation by
validating one subvolumegroup creation per cluster.
Fixes: #1123
Signed-off-by: Yug Gupta <ygupta@redhat.com>
Added an E2E to mount rbd PVC as readonly
in application pod and try to create some
file in Readonly PVC,when we try to create
files on RO PVC, we should get error.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
if the PVC access mode is ReadOnlyMany
or single node readonly, mounting the rbd
device path to the staging path as readonly
to avoid the write operation.
If the PVC acccess mode is readonly, mapping
rbd images as readonly.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
Go 1.13 contains support for error wrapping. To support wrapping,
fmt.Errorf now has a %w verb for creating wrapped errors, and three
new functions in the errors package ( errors.Unwrap, errors.Is and
errors.As) simplify unwrapping and inspecting wrapped errors.
With this change, If we currently compare errors using ==, we have to
use errors.Is instead. Example:
if err == io.ErrUnexpectedEOF
becomes
if errors.Is(err, io.ErrUnexpectedEOF)
https://tip.golang.org/doc/go1.13#error_wrapping
Signed-off-by: Humble Chirammal <hchiramm@redhat.com>
Added a test case to cover unmap of rbd image
if the mounting fails. if we pass the invalid
mount option the expectation is that mounting
of rbd image to stagingpath fails. as the unmap
happens it should not block the rbd pvc deletion
saying rbd image is in-use.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
util: golint warns about exported methods to have a
comment or to unexport them.
e2e: golint warns about package comment to be of the form
"Package e2e ..."
Reported-by: https://goreportcard.com/report/github.com/ceph/ceph-csi
Updates: #975
Signed-off-by: Yug Gupta <ygupta@redhat.com>
as kube is the shortform for kubernetes.
its expected to mention full form kubernetes
in the e2e tests.
Updated few wordings in the e2e.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
we dont need to explictly set the kind
and apiversion in the snapshot class object
as it is already set in snapshotclass.yaml file
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
the static check is failing as the replicapool
is used in 3 or more places, we need to define
a variable and use it.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
snapshot beta CRD wont work if the
kubernetes version is less than 1.17.0
as the snapshot CRD wont be installed
we cannot test the snapshot,so disabling
it if the kube version is less than 1.17
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
The name of the CephFS SubvolumeGroup for the CSI volumes was hardcoded to "csi". To make permission management in multi tenancy environments easier, this commit makes it possible to configure the CSI SubvolumeGroup.
related to #798 and #931
IneffAssign warns about the two following statements:
Line 1342: warning: ineffectual assignment to rFound (ineffassign)
Line 1350: warning: ineffectual assignment to zFound (ineffassign)
rFound and zFound should be set before entering the loop, otherwise the
initial value will overwrite the updated value on each iteration.
Reported-by: https://goreportcard.com/report/github.com/ceph/ceph-csi
Updates: #975
Signed-off-by: Niels de Vos <ndevos@redhat.com>
This commit adds support to mention dataPool parameter for the
topology constrained pools in the StorageClass, that can be
leveraged to mention erasure coded pool names to use for RBD
data instead of the replica pools.
Signed-off-by: ShyamsundarR <srangana@redhat.com>
- This commit adds tests only for RBD, as CephFS still needs
an enhancement in CephFS subvolume commands to effectively use
topology based provisioning
Signed-off-by: ShyamsundarR <srangana@redhat.com>
With client-go v1.18.0 there is a change where Signatures on methods
in generated clientsets, dynamic, metadata, and scale clients have been
modified to accept context.Context as a first argument.
Signatures of Create, Update, and Patch methods have been updated to accept
CreateOptions, UpdateOptions and PatchOptions respectively.
Signatures of Delete and DeleteCollection methods now accept DeleteOptions
by value instead of by reference
The framework.RunkubectlInput now accepts namespace as the first parameter
which is also accommodated with this PR.
Signed-off-by: Humble Chirammal hchiramm@redhat.com
Updated E2E to use a normal user other than admin user,
who is having access to create and mount cephfs PVC and
create and map rbd PVC
we will use the user created by rook who is having above
access.
Signed-off-by: Madhu Rajanna madhupr007@gmail.com
This PR adds a test case for #904
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
as we need to include the encryption
secret key inside the secret created by the
rook, This PR will add the key and value required
for the encryption inside the secrets.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>
This PR adds the support for helm
installation, and cephcsi helm charts
deployment and teardown and also runs E2E
on for helm charts.
Add socat to provide port forwadring access for helm
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>