currently we are fist operating on the dummy
image to refresh the pool and then we are adding
the scheduling. we think the scheduling should
be added first and than we should refresh the
pool. If we do this all the existing schedules
will be considered from the scheduler.
Signed-off-by: Madhu Rajanna <madhupr007@gmail.com>